| |
Manufacturing Route
Update of process routing for each products.
|
Daily Production Reports
Update of Daily Production Report based on Job Order.
|
Lot Traceability
Integration with Job Order Control, the production status for each Job Order shall be able to track easily.
|
Production Rejects
Update of production rejects details by defective code.
|
Production Down Time
Update the production down time & department responsible for the down time.
|
Transfer To Finished Goods Store
Finished Goods shall be transfer to stock by calling the DPR No.
|
Reports
• Generate Production Reports by production line (machine), date & etc.
• Production Status by Job Order.
• Production Efficiency Reports.
• Production Rejects Analysis.
• Production Down Time Analysis.
|